Work We've Delivered

Real projects, real results — built with precision and creativity.

Completed Projects

220 MW Shajibazar Power Plant Project, Bangladesh.

Client Name : Shajibazar Power Plant

Main Contractor : China Energy – NEPC

Work Name : Piling & Soil Development.

Work Period : 2014

Construction of Pre-Fabricated Steel Shed

Client Name : SMILE ARTS Company Ltd.

Main Contractor : B&F Engineering & Construction Limited

Work Name : Construction of Pre-Fabricated Steel Shed with Mezzanine Floor, Generator, Substation, Canteen, Prayer Room, Breast Feeding, Medical, Daycare Center, Guard & Fire Room, Internal Road & Boundary Wall.

Work Period : 2024

Mohora & Kalurghat Water Treatment Plant Rehabilitation Project.

Client Name : Chittagong WASA, Bangladesh, Ministry of LGED, Government of Bangladesh

Main Contractor : B&F Company Limited

Work Name : Geo-Technical Investigation Topography & Traffic Survey

Work Period : 2014

Feasibility Study on Karnaphuli Bridge Project.

Client Name : Korea Exim Bank

Main Contractor : B&F Company Ltd.

Work Name : Geo-Technical Investigation, Topographical survey

Work Period : 2015

Construction of Pre-Fabricated Shelter in 14-Border Out Posts (BOP) in hill tracks area in Bangladesh.

Client Name : Border Guard Bangladesh, Ministry of Homes, Government of Bangladesh.

Main Contractor : B&F Engineering & Construction Ltd.

Work Name : Design, Material Supply and Construction for Contractor’s Construction of Pre-Fabricated Shelter in 14-Border Out Posts.

Work Period : 2016

The Construction of Kanchpur, Meghna, Gumti 2nd Bridge and Existing Bridge Rehabilitation Project (Package No. PW-01).

Client Name : Dept. of Roads & Highways, Ministry of Road Transport & Bridges, Government of Bangladesh.

Main Contractor : OSJI JV

Work Name : Design, Supply and Construction for Contractor’s Accommodation for Local Staff for Kanchpur, Meghna, Gumti Yard.

Work Period : 2016

Matarbari Ultra Super Critical Coal Fired Power Plant Project

Client Name : Coal Power Generation Company Bangladesh Limited

Main Contractor : Sumitomo IHI-Toshiba, GC-POSCO E&C

Work Name : Geo-Technical Investigation, Topographical survey

Work Period : 2017

Factory Renovation Work (Floor Dismantling & Civil work)

Client Name : KiDO Dhaka industrial Ltd.

Main Contractor : KiDO Dhaka industrial Ltd.

Work Name : Factory Renovation Work

Work Period : 2022

Feasibility Study on Karnaphuli Bridge Project

Client Name : Korea Exim Bank

Main Contractor : B&F Company Limited

Work Name : Geo-Technical Investigation, Topographical survey

Work Period : 2016

Consulting Service for Karnaphuli Rail-Road Bridge Project

Client Name : Bangladesh Railway, Ministry of Railway, Government of Bangladesh

Main Contractor : YOOSHIN Engineering Corporation

Work Name : Geo-Technical Investigation Topography & Traffic Survey for Karnaphuli Rail-Road Bridge, Chittagong as a Local Consultant.

Work Period : 2015

Detailed Engineering Design Work for BRT Line-3 Corridor in Dhaka

Client Name : Dhaka Transport Coordination Authority(DTCA)

Main Contractor : Sunjin Engineering & Architects

Work Name : Detailed Engineering Design Work

Work Period : 2013 ~ 2016

Consultancy for Preparation of Detail Land use Plan of Matuail Sanitary Landfill Area.

Client Name : Dhaka South City Corporation

Main Contractor : B&F Company Limited

Work Name : Geo-Technical Investigation, Topographical survey, WTE, Landfill

Work Period : 2018

Consultancy for Preparation of Detail Land use Plan of Matuail Sanitary Landfill Area.

Client Name : Dhaka South City Corporation

Main Contractor : B&F Company Limited

Work Name : Design, 3D Animation & Reporting

Work Period : 2018

Detailed Design and Construction Supervision for Bangabandhu Sheikh Mujib Medical University and General Hospital

Client Name : Bangabandhu Sheikh Mujib Medical University (BSMMU)

Main Contractor : B&F Company Limited

Work Name : Detailed Design and Construction Supervision

Work Period : 2016 ~ 2020

315 KVA Substation Setup at B&F Factory, Keranigonj, Dhaka.

Client Name : B&F Engineering & Construction Ltd.

Main Contractor : B&F GROUP

Work Name : Setup 315 KV Substation

Work Period : 2019

Setup Solar Irrigation Pump & Solar Home System in Borendra Area in Rajshahi. KOICA Fund, Korean Government.

Client Name : REB Bangladesh, Ministry of Power & Mineral Resource, GoB.

Main Contractor : DAESUNG Energy, Korea

Work Name : Setup Solar Irrigation Pump & Solar Home System and Maintenance.

Work Period : 2013

KOICA BCC Project

Client Name : DAESHIN GLOBAL NETWORKS CO., LTD.

Main Contractor : B&F International Co., Ltd.

Work Name : Coordinator, Network & System Consulting, Equipment Install, System Management.

Work Period : 2004 ~ 2007

Laying of the SME4 Submarine Cable. Offshore Cox’s Bazar Cable Burial Work (1.2 KM)

Client Name : Ministry of ICT, Government of Bangladesh

Main Contractor : OTRONIX Subsea (Fujitsu,Japan)

Work Name : Laying Submarine Cable

Work Period : 2005

Optical Fiber Backbone Project

Client Name : SK NETWORKS

Main Contractor : B&F International Co., Ltd.

Work Name : urvey of Project Area, Preparation and installation of cable ducting, Drawing of cable lying, Drawing and detailed specification of trench works for OF cable laying, Installation of cable work including laying cables, connections of cables, testing of cables, conduct controller termination, maintenance.

Work Period : 2017

TOWER SETUP & WIRELESS RADIO LINK

Client Name : SK NETWORKS, Korea

Main Contractor : B&F Company Ltd.

Work Name : Supply and installation of 100 ft. & 80 ft. height 3-Leg self support pipe Tower

Work Period : 2011